(b) The height, design, and disposition of any building erected on
the lot shall be subject to the special approval of the Director of Public Works.
13
(c) The whole of the area coloured red on plan shall be formed by the
grantees at their own expense to such levels as may be approved by the Director of Public Works within 18 months from the date on which possession shall be given to the grantees.
(d) A right-of-way from the Tai Hang Road to the lot on a line to be
approved by the Director of Public Works will be given. The grantees shall construct a road or path on the piece of ground over and along which such right-of-way shall be given at such time or times and in such manner as the Director of Public Works may direct and shall uphold, maintain and repair such road or path and everything forming portion of or appertaining to it to the satisfaction of the Director of Public Works, and the grantees shall be responsible for the whole as if they were absolute owner thereof. Any alteration of the Government road to which the right-of-way is given absorbing a portion of such piece of ground or affecting the gradient thereof shall not give rise to any claim by the grantees who shall carry out all consequent alterations to such road or path constructed by
(e) The grantees shall construct substantial retaining walls, where
necessary, to obviate landslips in the event of their cutting away the hill to level the site or to protect any filling in connection with the same. Should a landslip occur as a result of such cutting or levelling, the grantees will be held responsible for and shall indemnify the Government and its officers from and against all actions, claims and demands arising out of any damage resulting from or brought about by such landslip.
(f) In the event of spoil from the excavated site or spoil sites or
other areas affected by the development of the lot being eroded and washed down into the nullahs, the grantees shall be held responsible and shall pay into the Colonial Treasury on demand such sun as may be demanded by Government to cover the cost of removal of spoil from or damage to the nullahs or other Government properties.
(g) The grantees shall construct to the satisfaction of the Director of
Public Works such drains or channels as that officer may consider necessary to intercept and carry off stormwater falling on or flowing on to the lot from the hillside, and the grantees shall be solely liable for and shall indemnify the Government and its officers from and against all actions, claims and demands arising out of any damage or nuisance caused thereby.
(h) The Government sewer will be extended to a point adjacent to the
lot, and the grantees shall pay into the Colonial Treasury on demand, the sum of $1,000.00 as a contribution towards the cost of such sewer.
(1) The grantees shall pay into the Colonial Treasury, on demand, the cost
of removing any Chinese graves at present on the area, if such removal becomes necessary, the work to be done by the Tung Wah Hospital Authorities.
(j) The grantees must notify the Superintendent of Botanical & Forestry Department in the event of their requiring the removal of any trees from the lot, which may interfere with building operations. Such trees will be removed by the said Superintendent.
(k) The grantees shall pay into the Colonial Treasury, on demand, the cost
of removing any water main, gas main or service pipe, cable, telegraph or telephone line, sewer or culvert, which the Director of Public Works may consider it necessary to have removed,
(1) The piece of ground marked Crown Reserve on the plan may be used for
such purpose as the Government may think fit and the same may for such purpose be cut away or filled in or the level thereof may be altered. The grantees shall not be entitled to compensation for any damage to the lot resulting from any such user, or cutting away, filling in or alteration of level